Plastering Pool Deck Resurfacing
Cooler, slip-resistant pebble surface—no demolition required.
Request a Pool Plastering Quote
Call Now
Trusted Local Pool-Deck Specialists
CSLB-Licensed & Insured | Family-Owned in LA | 5-Star Yelp & Google Reviews
Why Homeowners Upgrade to Plastering Pool
- Stays Up to 20 °F Cooler than concrete in direct sun
- Built-In Slip Resistance—porous texture drains puddles
- No Chlorine or Salt Fade—UV-stable resin
- 1–2 Day Install—swim again in 48 h
- No Demolition Costs—overlay your existing deck
- Custom Color Blends—match coping, tile, or stone
How it works
1
Prep & Crack Repair
diamond grind + patch
2
Stone-Epoxy Trowel
½″ depth across slab.
3
Seal, cure
swim again in 48 h
Plastering Pool vs. Popular Pool-Deck Alternatives
Why homeowners switch from knock-down “cool-deck” and pavers
| Feature | Plastering Pool Pebble Overlay | Knock-Down “Cool-Deck” | Concrete Pavers |
|---|---|---|---|
| Surface Temperature | ✓ Stays Cool | ◻︎ Warm | ✕ Hot in July sun |
| Slip Safety (Wet) | ✓ Built-in grip, porous | ◻︎ Medium | ◻︎ Variable (smooth edges) |
| Drainage / Puddle Control | ✓ Water drains through | ◻︎ Surface drains only | ◻︎ Depends on slope |
| Demolition Needed | ✓ None (overlay) | ◻︎ Often re-skim or chip | ✕ Full tear-out & base prep |
| Install Time* | ✓ 1–2 days | 3–4 days | 4–7 days |
| Weed / Ant Intrusion | ✓ None (seamless) | N/A | ✕ Yes (joint sand) |
| Custom Colours & Borders | ✓ 1 000 + blends | Limited tints | Limited paver colours |
| Routine Maintenance | ✓ Hose down; reglaze 2–3 yrs | Pressure-wash & re-coat | Re-sand & seal joints |
| Residential Warranty † | ✓ 3-Year Limited | 1–2 yrs typical | Varies by installer |
| Investment Level ‡ | $$ Mid-range | $$ Mid-range | $$$ High |
- *Typical timeline for a 400–600 sq ft deck in Southern CA.
- †Warranty covers adhesion failure & non-substrate cracking; routine maintenance required.
- ‡Relative cost; exact pricing depends on slab condition and square footage.
Our 3-Year Limited Warranty & Routine Care Requirements
Coverage: We warrant our Plastering Pool garage floors for three (3) years against adhesion failure and cracking not caused by substrate movement, as set forth in our official warranty documentation.
Exclusions: The warranty does not cover damage from abuse, excessive weight or force, chemical spills, prolonged standing water, UV discoloration, color variation from samples, or any cracking that results from concrete movement or instability.
Maintenance obligations: Routine cleaning and a reglaze top-coat every 2–3 years keep your floor looking fresh and maintain its protective seal. The cost of reglazing is the homeowner’s responsibility.
All implied warranties (merchantability, fitness for a particular purpose, etc.) are disclaimed to the fullest extent permitted by law. Plastering Pool is not liable for indirect, incidental, or consequential damages.
Pool-Deck Resurfacing with Plastering Pool – FAQ
What exactly is a Plastering Pool-deck overlay?
A ½-inch layer of clean river pebbles mixed with a high-solids, UV-stable epoxy binder and trowelled directly over your existing concrete deck—no jack-hammering required. It cures to a seamless, breathable surface that hides cracks and stains while adding natural texture.
Is it really cooler than plain concrete?
Yes. Independent heat-tests show pebble finishes stay up to 10–20 °F cooler than gray or stamped concrete because the open matrix stores less solar heat and the light-colored stones reflect sunlight.
How slip-resistant is the surface when wet?
The rounded stone texture plus microscopic grout lines create natural grip; water drains through instead of forming puddles, giving the deck a high wet-traction rating—ideal for kids running around the pool.
Will water puddle or stain the deck?
No. The porous structure lets splash-water percolate through to the concrete below and evaporate, virtually eliminating puddles and the algae rings they create.
Do you have to demolish my existing cool-deck or broom-finish concrete?
In almost every case, no. As long as the slab is sound, we grind it, patch visible cracks, and overlay the stone layer—saving you demolition cost and mess.
How long does installation take and when can we swim again?
A typical 400–600 sq ft pool deck is completed in 1–2 days. You can walk on it after about 12 hours and resume swimming in roughly 48 hours, weather permitting.
Is it safe around chlorine or salt-water pools and UV sunlight?
The epoxy we use is UV-stable and chemical-resistant; light surface rinse after heavy chemical spills is all that’s needed. Stones are naturally color-fast, so no fading or chalking from sun or pool water.
What upkeep is required?
Sweep or hose as needed; every 2–3 years apply a clear “reglaze” seal coat (homeowner cost) to refresh the binder and keep stones locked tight.
Can cracks re-appear?
The ½″ layer bridges hairline cracks. If the concrete moves later, the crack can mirror through and is excluded from warranty—but localized repairs are simple: grind, patch, and re-trowel the area.
What color or design choices do we have?
Choose from 4 signature coastal blends or 1 000-plus custom mixes; we can even create borders or inlays to match tile, coping, or landscape stone.
What warranty do you offer?
Your pool deck is covered by our 3-year limited warranty against adhesion failure and cracking not caused by slab movement. Damage from abuse, harsh chemicals, or lack of reglaze is excluded (see full terms).
How much does a pebble-epoxy pool deck cost?
Southern-California projects usually fall in the $7–$20+ per sq ft range, depending on slab prep and color blend. We provide a firm, itemized quote after a free on-site inspection.
A ½-inch layer of clean river pebbles mixed with a high-solids, UV-stable epoxy binder and trowelled directly over your existing concrete deck—no jack-hammering required. It cures to a seamless, breathable surface that hides cracks and stains while adding natural texture.
Yes. Independent heat-tests show pebble finishes stay up to 10–20 °F cooler than gray or stamped concrete because the open matrix stores less solar heat and the light-colored stones reflect sunlight.
The rounded stone texture plus microscopic grout lines create natural grip; water drains through instead of forming puddles, giving the deck a high wet-traction rating—ideal for kids running around the pool.
No. The porous structure lets splash-water percolate through to the concrete below and evaporate, virtually eliminating puddles and the algae rings they create.
In almost every case, no. As long as the slab is sound, we grind it, patch visible cracks, and overlay the stone layer—saving you demolition cost and mess.
A typical 400–600 sq ft pool deck is completed in 1–2 days. You can walk on it after about 12 hours and resume swimming in roughly 48 hours, weather permitting.
The epoxy we use is UV-stable and chemical-resistant; light surface rinse after heavy chemical spills is all that’s needed. Stones are naturally color-fast, so no fading or chalking from sun or pool water.
Sweep or hose as needed; every 2–3 years apply a clear “reglaze” seal coat (homeowner cost) to refresh the binder and keep stones locked tight.
The ½″ layer bridges hairline cracks. If the concrete moves later, the crack can mirror through and is excluded from warranty—but localized repairs are simple: grind, patch, and re-trowel the area.
Choose from 4 signature coastal blends or 1 000-plus custom mixes; we can even create borders or inlays to match tile, coping, or landscape stone.
Your pool deck is covered by our 3-year limited warranty against adhesion failure and cracking not caused by slab movement. Damage from abuse, harsh chemicals, or lack of reglaze is excluded (see full terms).
Southern-California projects usually fall in the $7–$20+ per sq ft range, depending on slab prep and color blend. We provide a firm, itemized quote after a free on-site inspection.
